Why “from PLN 2,000 to PLN 30,000” is not an answer
Almost every text about website prices ends with a range like that. The problem is that you cannot make any decision based on it, and the gap between the low and the high end does not come from the contractor's whim, but from a completely different scope of work.
A website is not one product, but a set of modules. A section with customer reviews costs differently than a section with text, a panel for editing content yourself is a separate piece of work, and a store with payments is practically a second project inside the first. That is why, instead of giving one number, we describe the items it is made of. You can calculate the price of the whole in the price calculator.
What the price is really made of
Every project starts with two fixed items that are in every quote: project start, meaning discovery, layout and the welcome section, and launch and optimisation, meaning going live on the server, speed and technical correctness. The rest depends on what you choose.
| Item | What it is |
| Project start | Discovery, layout, welcome section |
| Launch and optimisation | Going live, speed, technical details |
| Standard section | Offer, services, process, FAQ, team, contact |
| Extended section | Portfolio, interactive price list, reviews, counters |
| Subpage | The skeleton of another page in the website |
| Contact form | Sending, validation, spam protection |
| Photo gallery | Grid, enlargements, file optimisation |
| Content management panel (CMS) | Editing texts and photos yourself |
| Blog and news | List of posts, a post, categories (requires CMS) |
| Online store | Catalogue, basket, payments, order panel |
| Online booking | Choosing a time slot and e-mail confirmation, without integration with an external calendar |
| Map with directions | Map with a pin and a route |
| Google reviews | Real reviews pulled onto the website |
| Analytics and cookie consent | Statistics plus a lawful banner |
| Animation, level 1 | Calm section entrances |
| Animation, level 2 | Scroll choreography |
| Animation, level 3 | Cinematic layer, scenes driven by scrolling |
| Copywriting | We write the texts |
| Extra language | Language switcher plus a working translation |
| Generative video clip | Video material made for your brand |
You choose the items in the price calculator, and once you pick at least five you get one price for the whole and a code that locks it for 30 days. For a large project with its own integrations and its own schedule, we propose a conversation instead of a number.
Three example scopes
Three typical scopes of work, from the smallest to the largest. You can calculate the price of each of them, together with the extras you choose, in the price calculator.
01from PLN 2,499
Simple website with one subpage
A home page with a welcome screen and three standard sections, and one subpage with two standard sections. A contact form and a map with directions can be added.
- Price
- from PLN 2,499, extras priced together with the whole website
- Payment
- after handover, no deposit
- Lead time
- 2 weeks
02quote
Service website with subpages
A home page with seven sections (five standard plus two extended), three subpages with eight sections in total (six standard plus two extended), a form, a map, a gallery, a content management panel, online booking, Google reviews, analytics and scroll choreography.
- Price
- calculate the whole in the price calculator
- Payment
- after handover, no deposit
- Lead time
- about 3 weeks
03quote
Online store
A home page with five standard sections, two subpages with four sections in total (two standard plus two extended), a store with a catalogue, basket and payments, a content management panel, a gallery, a form, analytics, calm animation.
- Price
- calculate the whole in the price calculator
- Payment
- after handover, no deposit
- Lead time
- about 3 weeks
The same store with a cinematic layer and video clips is a clearly larger scope, and we then set the lead time in a conversation. At a large scale, the difference between a good and a bad quote is bigger than any discount, which is why we quote such a project after a conversation.
Example layouts for industries
Besides these three general examples, we have described example layouts for specific industries:
What pushes the price up the most
If the budget is fixed, there are three places where it is worth making a conscious decision:
01Online storeA catalogue, basket, payments and an order panel are a separate project. If you are selling a few products as a test, a cheaper start can be a pre-order or a simple order form.
02Content management panelIt makes sense when you will really change content every week. For a website that changes twice a year, it is cheaper to order the edit.
03Cinematic layerThe highest level of animation makes a huge impression, but it makes sense where the website is the main sales channel. Scroll choreography already gives a clearly dynamic website at a much lower cost than the cinematic layer.
Contrary to intuition: the number of photos, the length of the texts and the number of colour variants hardly move the quote. What moves it is the number of separate layouts to design, that is, sections and subpages.
Costs that get forgotten when signing the contract
The project price is one-off, but the website lives on. Three items that come back every year:
Hosting with business e-mailPLN 120a year
DomainPLN 172a year
Website carePLN 750a year, up to 6 changes, response within 2 working days
Together that is PLN 1,042 a year, or about PLN 87 a month. The AI assistant is counted separately, if you want someone to answer visitors to your website around the clock: it costs from PLN 99 to PLN 249 a month.
It is worth checking in every quote whether care is compulsory and whether the website still works without it. With us it is not compulsory, and the website still works.
How long it takes
The lead time counts from the start of work and the complete materials, not from the first conversation:
One-page website
from 1 wk
Multi-page website or one with a content management panel
2 to 3 wks
Online store or cinematic layer
from 3 wks
The most common reason for delays is not code, but materials: texts, photos, data for integrations and translations. Every extra language and copywriting for a large website really add time.
Five questions to ask every quote
- 1
What exactly does the price include? Ask for a description of the scope, not just one amount. If the contractor cannot say what exactly is in the price, they probably do not know themselves how much work lies ahead.
- 2
Who owns the website when it is finished? Full rights, and access to the repository and the panel, should be yours. Without that, every change of contractor starts with building everything from scratch.
- 3
Are texts and photos included in the price? This is the most common source of differences between quotes that look similar at first glance.
- 4
How much does running it cost and is it compulsory? Ask for the yearly amount, not the monthly one. It is easier to compare.
- 5
What happens after launch? How many rounds of corrections are included and on what terms faults are reported.
Questions and answers
How much does a simple website for a small business cost?
A simple website with one subpage, meaning a home page with three sections and a subpage with two sections, costs from PLN 2,499 with us, and the lead time is about 2 weeks. A contact form and a map with directions can be added as items priced together with the whole website. The starting point is the project start and the launch and optimisation, then come the items you choose, and you can calculate the price of the whole in the price calculator.
What does the price of a website depend on the most?
On the number of sections and subpages, because each of them is a separate design and a separate build, and on three items that can outweigh the whole quote: an online store, a content management panel (CMS) and the highest level of animation, the cinematic layer. The number of photos or the length of the texts affects the price much less.
Does the price of a website include yearly costs?
No, they are two separate things. The project price is one-off, while running costs recur: hosting with business e-mail PLN 120 a year, a domain PLN 172 a year, website care PLN 750 a year. Together that is PLN 1,042 a year, or about PLN 87 a month. The AI assistant, if you choose it, costs from PLN 99 to PLN 249 a month.
How long does it take to build a website?
A one-page website from a week, a multi-page website usually two to three weeks, an online store from three weeks. The lead time counts from the start of work and the complete materials, and what lengthens it is mostly on the client's side: texts, photos, translations and extra languages.
Why do some quotes end with a conversation instead of a price?
A large project usually has its own integration requirements and schedule, which cannot be honestly fitted into ready-made items, so instead of a number we propose a conversation and an individual quote.
Disclaimer. The prices in this text are final prices and apply on the date of the update. The service provider uses the small-business VAT exemption under Article 113 of the Polish VAT Act and does not add VAT to them. The price from the calculator is fixed for 30 days from the moment you accept it and receive the code. The scope of the project is confirmed by the contract. You can calculate the current price of the whole in the price calculator.