zorna/Guides/Preparation

Jas Bielec Updated: 9 October 2026 Reading time: about 6 minutes

Approximate lead times by scope

How long a website takes depends above all on its scope. For three typical projects it looks like this:

One-page website
from 1 wk
Multi-page website with a content management panel
2 to 3 wks
Online store
from 3 wks

We give the lead time together with the quote, once we know the scope. We reserve the date in the calendar when the contract is concluded and we stick to it.

An important detail: we count lead times from the later of two events, that is, from the contract being concluded or from the complete materials being delivered. So the clock does not start with the first e-mail, but when we have something to work with.

Project stages and how long they take

A project has six stages. For each we say how long it really takes and who it depends on.

  1. 1
    Quote and start You write through the form or by e-mail, and we reply within 24 hours. Then 30 minutes of conversation by phone or video and a quote for the scope. Accepting the quote by e-mail concludes the contract, with no deposit. The length of this stage depends mainly on how quickly you decide.
  2. 2
    Materials from you Texts or a decision about copywriting, photos, the logo, access to the domain. A sole trader will collect this in one evening if everything is at hand. When several people gather the materials, more time is needed. This is the stage that depends most on the client.
  3. 3
    First results: 3 working days We show the first results of the work, meaning an outline of the website, within 3 working days of the later of two events: the contract being concluded or the complete materials.
  4. 4
    Approval and corrections You look at the design and send comments. Included in the price are 3 rounds of corrections, and one round is one combined set of comments. Three numbers appear here: we ask for feedback within 3 working days, you send comments on a version within 5 working days of it being made available, and 7 working days without comments means acceptance without reservations.
  5. 5
    Launch on the domain Publishing on the hosting, the SSL certificate, connecting the domain, speed optimisation and the technical basics of SEO are part of every quote. We need access to the domain settings, and if you don't have a domain yet, we will help you register it.
  6. 6
    Handover and payment After you accept the finished website, you pay the full fee, and the payment term for the invoice is 7 days from its delivery. After payment we transfer the economic copyright, access to the repository, the documentation and a recording of the handover.

We treat no comments within 7 working days of handing over the project for approval as acceptance without reservations. So it is worth replying regularly, even briefly.

What most often lengthens a project

Code is rarely the bottleneck. Delays usually come from the project waiting for a decision or a material. The lead time then moves by the time spent waiting. The most common reasons:

  • Missing materials. Texts, photos and the logo arrive in pieces, and a missing element holds up a whole section.
  • Slow approval. The design sits for a few days with no reply, and then five separate e-mails with comments come back instead of one combined one.
  • Several people deciding at once. Each has a different opinion, and the final version emerges after many rounds.
  • A change of concept after approval. A change of scope after the design is approved is a new order with a separate quote and its own lead time.
  • No access to the domain. The website is ready, but nobody knows who has the account with the registrar.
  • Growing the scope along the way. Adding a content management panel or a store moves the lead time from the level of a one-page website to 2 to 3 weeks or longer.

If the client, despite a reminder, does not deliver materials or cooperate for more than 30 days, we may withdraw from the contract. We then settle only the work done up to that day.

How to shorten the lead time

You have influence over most delays. Five habits that really speed a project up:

  1. 1
    Prepare the materials before the start. The list of eight things is in the guide what to prepare before ordering a website.
  2. 2
    Name one decision maker. Let that person collect opinions inside the company and answer with one voice.
  3. 3
    Send comments together. One list of comments is one round of corrections. Five e-mails over a week is the same work, only slower.
  4. 4
    Make sure you have access to the domain from the start. Check who has the account with the registrar before the project reaches launch.
  5. 5
    Close the scope before the start. Choose sections and features in the price calculator, which gives one price for the whole once you pick at least five items.

Does working remotely lengthen a project

No. We run the whole project remotely: phone, video call and e-mail, and we handle materials, corrections and handover online. We don't arrange meetings in an office, so they don't add days to the schedule. We work this way with businesses from all over Poland.

You pay only after handover of the finished website. Every day of delay, on either side, moves the end of the project.

Questions and answers

How long does it take to build a website?
A one-page website starts from 1 week, a website with subpages and a content management panel takes 2 to 3 weeks, and an online store from 3 weeks. The exact lead time depends on the scope and on how quickly you deliver the materials and approvals.
From when do you count the lead time?
From the later of two events: the contract being concluded or the complete materials needed for the work being delivered. The contract is concluded the moment you accept the quote, for example by e-mail.
When will I see the first results of the work?
We show the first results of the work within 3 working days, counting from the later of two events: the contract being concluded or the complete materials being delivered.
What if I am late with materials or approval?
The lead time is then extended by the time spent waiting for materials, approvals or answers. We ask for feedback within 3 working days. If the client, despite a reminder, does not cooperate for more than 30 days, we may withdraw from the contract and settle only the work done.
Do I have to pay up front?
No. We don't take deposits. You pay the whole fee after handover of the finished website, and the payment term for the final invoice is 7 days from its delivery. We transfer the copyright, access to the repository and the documentation after payment.
Do I have to meet in person?
No. We run the whole project remotely: we talk by phone, video call and e-mail, and we handle materials, corrections and handover online.
Contact

Let's talk about your website.

Write a few sentences about your business. We reply within 24 hours with an idea and a quote. You pay after handover, no deposit.

CallFree quote